Back
January 2025

VPP Readiness Index

VPP Readiness Index

Integrate to Zero (I2Z) and Blunomy designed a Virtual Power Plant (VPP) Readiness Index to assess a country’s readiness for large-scale VPP deployment based on its technical, regulatory and commercial characteristics.

VPPs are aggregations of Consumer Energy Resources (CERs), orchestrated by software, that can provide utility -scale and utility-grade grid services to Grid System Operators (GSOs) or Distribution System Operators (DSOs). They are an emerging capital and cost-efficient alternative to the traditional supply-side measures employed to manage the increasing penetration of variable renewable energy-based electricity generation in the grid.

In this report, the VPP Readiness Index was applied to 12 countries across five continents at varying economic and electricity market maturity levels: Kenya, South Africa, Nigeria, India, Indonesia, Malaysia, France, the United Kingdom, Australia, Brazil, Chile and Colombia. It presents a comparative analysis of the results, and a detailed assessment for each country.

This report also details how VPPs work, their value proposition, and the method and criteria used to assess each country.

Further reading : read the VPP readiness Index - Canada Edition

spacer for the website

Q&A

Q: How does the VPP Readiness Index assess a country’s ability to scale Virtual Power Plants for grid decarbonisation?

A: Developed by Blunomy and Integrate to Zero across 12 countries, the index evaluates technical, regulatory, and market readiness—identifying leaders like Australia and France while highlighting critical gaps in revenue access and smart metering.

Discover other related contents